Permeable Sub-Base Installation Cost Calculator

A permeable sub-base stores or conveys water as well as supporting the surface. Its aggregate must match the complete drainage design. Use the dedicated calculator to explore a guide budget for the work described below.

Instant Estimate

Permeable Sub-Base Installation Calculator

Estimate permeable sub-base installation from the measurements and work options below. Guide allowances are already included; a contractor’s quote is not required to use the tool.

Your Estimate

Estimated Total

Calculating…

Do not substitute a dense aggregate for an open-graded specification. Storage volume and infiltration need a site assessment.

Guide model reviewed 7 November 2026. VAT treatment varies between published guides and supplier quotes; no VAT is added automatically. Add it only where your allowances exclude it.

Rate assumptions and source

The guide covers sub-base construction by measured area. The depth field gives a quantity check, while the actual depth, aggregate and compaction are determined by the agreed specification. Do not interpret the displayed volume as approval of a particular foundation.

View the published guide used for the main allowance. Optional allowances are budgeting estimates and can differ from a site-specific quotation.

Want an accurate quote?

Compare quotes from driveway installers for your project.

Compare permeable sub-base installation quotes

Use a measured specification to compare prices for your property. Ask contractors to confirm the work, preparation, materials, access, disposal and any exclusions before agreeing a price.

Permeable Sub-Base Installation planned around your property

A permeable sub-base stores or conveys water as well as supporting the surface. Its aggregate must match the complete drainage design.

Do not substitute a dense aggregate for an open-graded specification. Storage volume and infiltration need a site assessment.

Planning permeable sub-base installation

A permeable sub-base stores or conveys water as well as supporting the surface. Its aggregate must match the complete drainage design.

Do not substitute a dense aggregate for an open-graded specification. Storage volume and infiltration need a site assessment.

Measuring the work for this calculator

Measure the length and width of the work area in metres. Split an irregular outline into rectangles and add their areas. Where a depth or unit-count field is provided, it gives a separate quantity check; it does not decide the correct construction specification.

What the permeable sub-base installation estimate covers

The guide covers sub-base construction by measured area. The depth field gives a quantity check, while the actual depth, aggregate and compaction are determined by the agreed specification. Do not interpret the displayed volume as approval of a particular foundation.

The first guide option is open-graded type 3 sub-base construction. Its allowance is £55–£85 for the relevant unit shown in the result. This is a published-guide starting point; it is not a price offered by a contractor on this website.

Choose the specification and separate allowances

This page models open-graded type 3 sub-base construction. A different construction or repair method needs a separate allowance rather than an assumption that every job has the same scope.

The project controls include:

  • Specified layer depth (mm).

Reading the budget breakdown

The results show the measured quantity, the selected work allowance and any separately selected items. A volume, unit count or coverage result is a quantity check, not a construction design. Where the model uses a minimum visit allowance or whole bags, the displayed total will not fall in direct proportion to a very small area.

Use the optional contingency to make a separate budget provision. Add a quoted fixed allowance only for work outside the model’s stated scope. Check the VAT basis before selecting the VAT adjustment.

Compare quotations for permeable sub-base installation

Give contractors the same measurements and work description. Ask them to identify the main work, preparation, disposal, access requirements, drainage and any making-good that applies to this project. An apparent saving can simply mean that a different part of the scope has been priced.

Do not substitute a dense aggregate for an open-graded specification. Storage volume and infiltration need a site assessment. Keep the agreed specification with the quote, including any exclusions and the way changes discovered during the work will be authorised.

Permeable Sub-Base Installation Price Guide

Examples use the specification named on each card, the calculator’s example measurements and guide allowances. Optional extras, contingency and VAT adjustment are off. Supply-only models exclude installation.

20 m² measured area

£1,100–£1,700
Open-graded Type 3 sub-base construction
Guide example

32 m² measured area

£1,760–£2,720
Open-graded Type 3 sub-base construction
Guide example

50 m² measured area

£2,750–£4,250
Open-graded Type 3 sub-base construction
Guide example

75 m² measured area

£4,125–£6,375
Open-graded Type 3 sub-base construction
Guide example

100 m² measured area

£5,500–£8,500
Open-graded Type 3 sub-base construction
Guide example

150 m² measured area

£8,250–£12,750
Open-graded Type 3 sub-base construction
Guide example

Permeable Sub-Base Installation FAQs

The guide covers sub-base construction by measured area. The depth field gives a quantity check, while the actual depth, aggregate and compaction are determined by the agreed specification. Do not interpret the displayed volume as approval of a particular foundation.

Measure the length and width of the work area in metres. Split an irregular outline into rectangles and add their areas. Where a depth or unit-count field is provided, it gives a separate quantity check; it does not decide the correct construction specification.

A permeable sub-base stores or conveys water as well as supporting the surface. Its aggregate must match the complete drainage design. Do not substitute a dense aggregate for an open-graded specification. Storage volume and infiltration need a site assessment.

The figures are early budgeting allowances for the work described in the selected option. Do not substitute a dense aggregate for an open-graded specification. Storage volume and infiltration need a site assessment. Ask a contractor to confirm the measured scope, access, preparation, materials and exclusions after assessing the property. The written quotation, rather than the calculator, establishes the work and the agreed price.

The result separates the main work from selected options and any additional allowance you enter. Do not add an item again if the main rate or contractor’s quote already includes it. Contingency is optional and is shown separately.

No extra VAT is added automatically. Published cost guides and supplier prices can use different VAT bases, so check the source and any written quotation. The optional VAT control adds 20% to the calculated allowances only when you select it. Leave it off when the rates or quotation already include VAT to avoid counting tax twice.