Planning permeable sub-base installation
A permeable sub-base stores or conveys water as well as supporting the surface. Its aggregate must match the complete drainage design.
Do not substitute a dense aggregate for an open-graded specification. Storage volume and infiltration need a site assessment.
Measuring the work for this calculator
Measure the length and width of the work area in metres. Split an irregular outline into rectangles and add their areas. Where a depth or unit-count field is provided, it gives a separate quantity check; it does not decide the correct construction specification.
What the permeable sub-base installation estimate covers
The guide covers sub-base construction by measured area. The depth field gives a quantity check, while the actual depth, aggregate and compaction are determined by the agreed specification. Do not interpret the displayed volume as approval of a particular foundation.
The first guide option is open-graded type 3 sub-base construction. Its allowance is £55–£85 for the relevant unit shown in the result. This is a published-guide starting point; it is not a price offered by a contractor on this website.
Choose the specification and separate allowances
This page models open-graded type 3 sub-base construction. A different construction or repair method needs a separate allowance rather than an assumption that every job has the same scope.
The project controls include:
- Specified layer depth (mm).
Reading the budget breakdown
The results show the measured quantity, the selected work allowance and any separately selected items. A volume, unit count or coverage result is a quantity check, not a construction design. Where the model uses a minimum visit allowance or whole bags, the displayed total will not fall in direct proportion to a very small area.
Use the optional contingency to make a separate budget provision. Add a quoted fixed allowance only for work outside the model’s stated scope. Check the VAT basis before selecting the VAT adjustment.
Compare quotations for permeable sub-base installation
Give contractors the same measurements and work description. Ask them to identify the main work, preparation, disposal, access requirements, drainage and any making-good that applies to this project. An apparent saving can simply mean that a different part of the scope has been priced.
Do not substitute a dense aggregate for an open-graded specification. Storage volume and infiltration need a site assessment. Keep the agreed specification with the quote, including any exclusions and the way changes discovered during the work will be authorised.