Planning resin bonded driveways
Resin-bonded aggregate is scattered onto resin applied over a base. It is a different system from resin-bound stone and should not be priced or described as the same permeable finish.
The guide rate is for an overlay; base reconstruction, removal and drainage need separate allowances.
Measuring the work for this calculator
Measure the length and width of the work area in metres. Split an irregular outline into rectangles and add their areas. Where a depth or unit-count field is provided, it gives a separate quantity check; it does not decide the correct construction specification.
What the resin bonded driveways estimate covers
This model estimates a resin-bonded overlay on a suitable base. The substrate, falls and drainage need checking before the overlay is priced. Base reconstruction and a new highway crossing are not automatically included.
The first guide option is resin-bonded overlay on a suitable base. Its allowance is £80–£120 for the relevant unit shown in the result. This is a published-guide starting point; it is not a price offered by a contractor on this website.
Choose the specification and separate allowances
This page models resin-bonded overlay on a suitable base. A different construction or repair method needs a separate allowance rather than an assumption that every job has the same scope.
Reading the budget breakdown
The results show the measured quantity, the selected work allowance and any separately selected items. A volume, unit count or coverage result is a quantity check, not a construction design. Where the model uses a minimum visit allowance or whole bags, the displayed total will not fall in direct proportion to a very small area.
Use the optional contingency to make a separate budget provision. Add a quoted fixed allowance only for work outside the model’s stated scope. Check the VAT basis before selecting the VAT adjustment.
Compare quotations for resin bonded driveways
Give contractors the same measurements and work description. Ask them to identify the main work, preparation, disposal, access requirements, drainage and any making-good that applies to this project. An apparent saving can simply mean that a different part of the scope has been priced.
The guide rate is for an overlay; base reconstruction, removal and drainage need separate allowances. Keep the agreed specification with the quote, including any exclusions and the way changes discovered during the work will be authorised.