Planning driveway drainage
Driveway drainage should start with the source and destination of the water. A channel without a suitable outfall can simply move the problem.
The measured run and an optional soakaway allowance help budget installation, but do not size pipes or establish discharge permissions.
Measuring the work for this calculator
Measure each proposed run in metres and add the lengths together. Include returns and changes of direction in your measured scope. Only enter an additional connection or removal allowance when that work is outside the installed guide rate.
What the driveway drainage estimate covers
The calculation separates the measured run, a basic system allowance where selected, and any connection work you enter. Infiltration testing, storage design, abnormal ground, permissions and engineered attenuation may require additional work beyond the guide.
The first guide option is trench and pipe drainage guide. Its allowance is £35–£70 for the relevant unit shown in the result. This is a published-guide starting point; it is not a price offered by a contractor on this website.
Choose the specification and separate allowances
The available work options are trench and pipe drainage guide; domestic channel drainage. Select the one that matches the proposed scope before comparing the result.
The project controls include:
- Add a basic soakaway guide (£377–£793; subject to assessment).
Reading the budget breakdown
The results show the measured quantity, the selected work allowance and any separately selected items. A volume, unit count or coverage result is a quantity check, not a construction design. Where the model uses a minimum visit allowance or whole bags, the displayed total will not fall in direct proportion to a very small area.
Use the optional contingency to make a separate budget provision. Add a quoted fixed allowance only for work outside the model’s stated scope. Check the VAT basis before selecting the VAT adjustment.
Compare quotations for driveway drainage
Give contractors the same measurements and work description. Ask them to identify the main work, preparation, disposal, access requirements, drainage and any making-good that applies to this project. An apparent saving can simply mean that a different part of the scope has been priced.
The measured run and an optional soakaway allowance help budget installation, but do not size pipes or establish discharge permissions. Keep the agreed specification with the quote, including any exclusions and the way changes discovered during the work will be authorised.